• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

top-sim / topsim / 81 / 1
87%
master: 92%

Build:
Build:
LAST BUILD BRANCH: 41_add-experiment-cli
DEFAULT BRANCH: master
Ran 25 Jun 2021 03:54AM UTC
Files 36
Run time 1s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

25 Jun 2021 03:53AM UTC coverage: 87.041%. First build
81.1

push

travis-ci-com

myxie
Scheduler and scheduling policies based on plans have been updated to ensure
data-transfer time happens within the simulation, rather than as a product of
the estimated start time (EST) as determined in the plan.

This allows a simplified dynamic-schedule-from-plan approach; improves the
accuracy of the model; and paves the way for a batch-scheduling approach that
does not require additional work within the Scheduler.

Tasks are now in control of their compute duration _and_ their their data-transfer delays.
These currently do not have a delay feature, but are computed based on data cost established
from the workflow structure.

Future work on the batch scheduler will require only the use of a sorting 'queue',
and the allocation of estimated start times that are placeholder values for
the purpose of sorting in the scheduler.

1800 of 2068 relevant lines covered (87.04%)

0.87 hits per line

Source Files on job 81.1
  • Tree
  • List 0
  • Changed 0
  • Source Changed 0
  • Coverage Changed 0
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 71
  • Travis Job 81.1
  • 50870b57 on github
  • Next Job for on data_transfer_update (#83.1)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc