• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

top-sim / topsim / 81
87%
master: 92%

Build:
Build:
LAST BUILD BRANCH: 41_add-experiment-cli
DEFAULT BRANCH: master
Ran 25 Jun 2021 03:54AM UTC
Jobs 1
Files 36
Run time 2s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

pending completion
81

push

travis-ci-com

myxie
Scheduler and scheduling policies based on plans have been updated to ensure
data-transfer time happens within the simulation, rather than as a product of
the estimated start time (EST) as determined in the plan.

This allows a simplified dynamic-schedule-from-plan approach; improves the
accuracy of the model; and paves the way for a batch-scheduling approach that
does not require additional work within the Scheduler.

Tasks are now in control of their compute duration _and_ their their data-transfer delays.
These currently do not have a delay feature, but are computed based on data cost established
from the workflow structure.

Future work on the batch scheduler will require only the use of a sorting 'queue',
and the allocation of estimated start times that are placeholder values for
the purpose of sorting in the scheduler.

1800 of 2068 relevant lines covered (87.04%)

0.87 hits per line

Jobs
ID Job ID Ran Files Coverage
1 81.1 25 Jun 2021 03:54AM UTC 0
87.04
Travis Job 81.1
Source Files on build 81
Detailed source file information is not available for this build.
  • Back to Repo
  • Build #81
  • 50870b57 on github
  • Next Build on data_transfer_update (#83)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc