• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

grpc / grpc-java / 20892 / 1
89%
master: 89%

Build:
DEFAULT BRANCH: master
Ran 23 Dec 2020 09:56PM UTC
Files 431
Run time 44s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

23 Dec 2020 09:37PM UTC coverage: 87.097% (-0.02%) from 87.119%
GRADLE_OPTS=-Xmx512m LDFLAGS=-L/tmp/protobuf/lib CXXFLAGS=-I/tmp/protobuf/include LD_LIBRARY_PATH=/tmp/protobuf/lib

push

travis-ci

ejona86
core: Include wait-for-ready in deadline exceeded insights

There was a report from a user in b/176088054 that experienced an RPC
waiting_for_connection that failed after 45 minutes due to deadline.
That would be quite normal for wait-for-ready, but because we didn't
include that detail in the status we have to do code inspection to
determine if wait-for-ready was enabled.

25839 of 29667 relevant lines covered (87.1%)

0.87 hits per line

Source Files on job 20892.1 (GRADLE_OPTS=-Xmx512m LDFLAGS=-L/tmp/protobuf/lib CXXFLAGS=-I/tmp/protobuf/include LD_LIBRARY_PATH=/tmp/protobuf/lib)
  • Tree
  • List 0
  • Changed 6
  • Source Changed 1
  • Coverage Changed 6
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 17330
  • Travis Job 20892.1
  • 20197d36 on github
  • Prev Job for GRADLE_OPTS=-Xmx512m LDFLAGS=-L/tmp/protobuf/lib CXXFLAGS=-I/tmp/protobuf/include LD_LIBRARY_PATH=/tmp/protobuf/lib on master (#20891.1)
  • Next Job for GRADLE_OPTS=-Xmx512m LDFLAGS=-L/tmp/protobuf/lib CXXFLAGS=-I/tmp/protobuf/include LD_LIBRARY_PATH=/tmp/protobuf/lib on master (#20902.1)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc