• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

nokia / danm / 1009 / 2
46%
master: 44%

Build:
Build:
LAST BUILD BRANCH: api_group_migration
DEFAULT BRANCH: master
Ran 29 Aug 2020 10:26AM UTC
Files 16
Run time 1min
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

29 Aug 2020 10:18AM UTC coverage: 46.453% (-0.03%) from 46.486%
TRAVIS_PIPELINE=docker

push

travis-ci

Levovar
Cosmetic / low-impact changes in dummy kernel interface feature

1: When VLAN is configured we only add the VF MAC to the final interface, and not for the underlay
2: Proper sysctl settings are now manually applied on the underlay dummy as well (i.e. IPv6 ON/OFF)

1290 of 2777 relevant lines covered (46.45%)

27318.19 hits per line

Source Files on job 1009.2 (TRAVIS_PIPELINE=docker)
  • Tree
  • List 0
  • Changed 2
  • Source Changed 1
  • Coverage Changed 2
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 684
  • Travis Job 1009.2
  • b34ee807 on github
  • Prev Job for TRAVIS_PIPELINE=docker on dummy_cosmetics (#1008.2)
  • Next Job for TRAVIS_PIPELINE=docker on dummy_cosmetics (#1013.2)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2025 Coveralls, Inc