• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

nokia / danm / 1013 / 2
46%
master: 44%

Build:
Build:
LAST BUILD BRANCH: api_group_migration
DEFAULT BRANCH: master
Ran 31 Aug 2020 02:45PM UTC
Files 16
Run time 1s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

31 Aug 2020 02:37PM UTC coverage: 46.071% (-0.4%) from 46.453%
TRAVIS_PIPELINE=docker

push

travis-ci

Levovar
Cosmetic / low-impact changes in dummy kernel interface feature

1: When VLAN is configured we only add the VF MAC to the final interface, and not for the underlay
2: Proper sysctl settings are now manually applied on the underlay dummy as well (i.e. IPv6 ON/OFF)

1290 of 2800 relevant lines covered (46.07%)

27093.79 hits per line

Source Files on job 1013.2 (TRAVIS_PIPELINE=docker)
  • Tree
  • List 0
  • Changed 3
  • Source Changed 2
  • Coverage Changed 3
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 688
  • Travis Job 1013.2
  • e264eb51 on github
  • Prev Job for TRAVIS_PIPELINE=docker on dummy_cosmetics (#1009.1)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc