• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

optimizely / javascript-sdk / 815 / 5
78%
master: 78%

Build:
DEFAULT BRANCH: master
Ran 16 May 2019 12:44AM UTC
Files 51
Run time 3s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

16 May 2019 12:38AM UTC coverage: 97.587% (+0.007%) from 97.58%
815.5

push

travis-ci

web-flow
fix (datafile management): Clear timeout created in onReady method when it's no longer needed (#272)

Summary:

onReady sets a timeout that fulfills a timeout promise. The timeout promise is only used to race against the ready promise provided by ProjectConfigManager. So, as soon as ProjectConfigManager's ready promise is fulfilled, the timeout can be cleared. Before this change, the timeout would only be cleared in the close method.

Test plan:

Manual & added unit test

584 of 635 branches covered (91.97%)

Branch coverage included in aggregate %.

5726 of 5831 relevant lines covered (98.2%)

18.53 hits per line

Source Files on job 815.5
  • Tree
  • List 0
  • Changed 5
  • Source Changed 2
  • Coverage Changed 5
Coverage ∆ File Lines Relevant Covered Missed Hits/Line Branch Hits Branch Misses
  • Back to Build 600
  • Travis Job 815.5
  • 69dbde12 on github
  • Prev Job for on master (#811.2)
  • Next Job for on master (#819.2)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2025 Coveralls, Inc