• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

zalando-incubator / kube-ingress-aws-controller / 605 / 1
72%
master: 72%

Build:
DEFAULT BRANCH: master
Ran 22 Jul 2018 05:31PM UTC
Files 18
Run time 2s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

22 Jul 2018 05:25PM UTC coverage: 45.601%. Remained the same
605.1

push

travis-ci

web-flow
Cleanup controller initialization and termination (#194)

This is just a bit of cleanup around the control loop. Mostly cosmetic.

* Run `doWork` in the beginning of the control loop instead of always
waiting 30s before doing any work.
* Use a `context` for stopping the control loop and get rid of the
custom channels.

Signed-off-by: Mikkel Oscar Lyderik Larsen <m@moscar.net>

964 of 2114 relevant lines covered (45.6%)

3.21 hits per line

Source Files on job 605.1
  • Tree
  • List 0
  • Changed 4
  • Source Changed 2
  • Coverage Changed 4
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 507
  • Travis Job 605.1
  • 4a34c915 on github
  • Prev Job for on master (#589.1)
  • Next Job for on master (#608.1)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc