|
Ran
|
Files
910
|
Run time
34s
|
Badge
README BADGES
|
push
github
ci(packages): Schedule weekly deletion of kpi images older than 90 days INFRA-431 (#7016) ### 💭 Notes This cleans up images older than 90 days in ghcr, it is scheduled to be cleaned Sundays at 00:00. [Here](https://github.com/kobotoolbox/kpi/actions/runs/25375137643) is the dry run of images to be deleted. The deletion cuts off at [<a class=hub.com/kobotoolbox/kpi/commit/<a class="double-link" href="https://git"><a class=hub.com/kobotoolbox/kpi/commit/<a class="double-link" href="https://git"><a class=hub.com/kobotoolbox/kpi/commit/1c1524649e57db7e2e3b8a939f0936044bcf2cb3">1c1524649](https://github.com/orgs/kobotoolbox/packages/container/kpi/670229637?tag=1c1524649e57db7e2e3b8a939f0936044bcf2cb3)[1c1524649e57db7e2e3b8a939f0936044bcf2cb3](https://github.com/orgs/kobotoolbox/packages/container/kpi/670229637?tag=1c1524649e57db7e2e3b8a939f0936044bcf2cb3)
5906 of 12127 branches covered (48.7%)
22227 of 36402 relevant lines covered (61.06%)
0.61 hits per line
| Coverage | ∆ | File | Lines | Relevant | Covered | Missed | Hits/Line | Branch Hits | Branch Misses |
|---|