• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

grondo / flux-core / 694
75%
master: 80%

Build:
Build:
LAST BUILD BRANCH: cherry-pick-rebase-pull-request-3-7c65ded4-944b-4c3a-8e00-ed2b4fd71d98-b8e939d0-a398-47dc-b90f-81ca7bbc3c71
DEFAULT BRANCH: master
Ran 05 May 2016 06:12PM UTC
Jobs 1
Files 140
Run time 9s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

pending completion
694

push

travis-ci

grondo
modules/cron: allow tasks to run a small delta after sync event

Instead of always delaying tasks to run on the next synchronization
event, allow tasks to run up to a small amount of time after the
sync event, thus preventing tasks from being delayed if there are
scheduled *almost* at the same time as the synchronization event.

The epsilon value for sync is settable via the sync_epsilon=
module parameter.

18787 of 25239 relevant lines covered (74.44%)

489703.57 hits per line

Jobs
ID Job ID Ran Files Coverage
3 694.3 05 May 2016 06:12PM UTC 0
74.44
Travis Job 694.3
Source Files on build 694
Detailed source file information is not available for this build.
  • Back to Repo
  • Travis Build #694
  • 30ab37a3 on github
  • Prev Build on cron (#693)
  • Next Build on cron (#696)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc