• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

mirage / mirage-block-volume / 121

Builds Branch Commit Type Ran Committer Via Coverage
121 master Merge pull request #60 from simonjbeaumont/cp-11864-idempotency Make LvRemove operation idempotent push 22 Apr 2015 09:43AM UTC djs55 travis-ci pending completion   set done
120 master Make LvRemove operation idempotent Also add a dummy function to the unit test to check we've caught all the operations in Redo.Op.t. Signed-off-by: Si Beaumont <simon.beaumont@citrix.com> Pull #60 22 Apr 2015 09:06AM UTC simonjbeaumont travis-ci pending completion   set done
119 master Merge pull request #59 from simonjbeaumont/cp-11864-idempotency Make all LV operations idempotent at the redo log level push 21 Apr 2015 02:04PM UTC djs55 travis-ci pending completion   set done
117 master Use UUIDs to index LVs and for redo log operations This fixes the failing test added by 6a219e8 for the idempotency of the LvRename operation. This preserves the use of name strings for the interface exposed by the Vg module. At the moment, loo... Pull #59 21 Apr 2015 01:32PM UTC simonjbeaumont travis-ci pending completion   set done
118 master Use UUIDs to index LVs and for redo log operations This fixes the failing test added by 6a219e8 for the idempotency of the LvRename operation. This preserves the use of name strings for the interface exposed by the Vg module. At the moment, loo... Pull #59 21 Apr 2015 01:30PM UTC simonjbeaumont travis-ci pending completion   set done
114 v0.9.0 Merge pull request #58 from djs55/add-clock Update to new Time/Clock interfaces push 12 Apr 2015 10:34PM UTC djs55 travis-ci pending completion   set done
113 master Merge pull request #58 from djs55/add-clock Update to new Time/Clock interfaces push 10 Apr 2015 04:17PM UTC djs55 travis-ci pending completion   set done
112 master Disable the write-limiting here, rely on the redo log code The redo log code knows how full the redo log is, so can flush immediately if the journal fills. Signed-off-by: David Scott <dave.scott@citrix.com> Pull #58 10 Apr 2015 03:48PM UTC djs55 travis-ci pending completion   set done
111 master Merge pull request #55 from jonludlam/redo-status Redo status push 17 Mar 2015 04:23PM UTC jonludlam travis-ci pending completion   set done
110 master Test the set_status function Signed-off-by: Jon Ludlam <jonathan.ludlam@citrix.com> Pull #55 17 Mar 2015 03:17PM UTC jonludlam travis-ci pending completion   set done
109 master Merge pull request #54 from djs55/ocaml.4.01 Retain compatibility with OCaml 4.01 push 17 Mar 2015 03:10PM UTC djs55 travis-ci pending completion   set done
108 master Retain compatibility with OCaml 4.01 Signed-off-by: David Scott <dave.scott@citrix.com> Pull #54 17 Mar 2015 02:17PM UTC djs55 travis-ci pending completion   set done
107 master Merge pull request #52 from djs55/more-results Performance improvements push 15 Mar 2015 07:05PM UTC djs55 travis-ci pending completion   set done
106 master Increase the flush interval to 120.s Signed-off-by: David Scott <dave.scott@citrix.com> Pull #52 15 Mar 2015 06:46PM UTC djs55 travis-ci pending completion   set done
105 master Merge pull request #51 from djs55/more-results test: heavy use of the redo log push 15 Mar 2015 01:42PM UTC djs55 travis-ci pending completion   set done
  • ← Previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • Next →
  • Back to Repo
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2025 Coveralls, Inc