• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

mirage / mirage-block-volume / 166

Builds Branch Commit Type Ran Committer Via Coverage
166 master Merge pull request #77 from simonjbeaumont/lvtransfer Fix LvTransfer to assign the correct segments to the source LV push 08 Aug 2015 08:57AM UTC djs55 travis-ci pending completion   set done
165 master LvTransfer: Update the source with the correct segments We were updating the source LV with the blocks that we were asking to transfer. So that an LvTransfer A B s would set the segments of A and B to s. This is clearly not what we want and was d... Pull #77 07 Aug 2015 11:09PM UTC simonjbeaumont travis-ci pending completion   set done
164 master packaging: Uninstall all ocamlfind modules Signed-off-by: Si Beaumont <simon.beaumont@citrix.com> Pull #77 07 Aug 2015 11:08PM UTC simonjbeaumont travis-ci pending completion   set done
163 master LvTransfer: Update the source with the correct segments We were updating the source LV with the blocks that we were asking to transfer. So that an LvTransfer A B s would set the segments of A and B to s. This is clearly not what we want and was d... Pull #77 07 Aug 2015 10:59PM UTC simonjbeaumont travis-ci pending completion   set done
162 master Merge pull request #76 from simonjbeaumont/lvtransfer Replace LvCrop with LvTransfer operation push 06 Aug 2015 04:42PM UTC djs55 travis-ci pending completion   set done
161 master Replace LvCrop with LvTransfer operation LvCrop was only used to transfer blocks from the free list to a host. It's more useful to have an LvTransfer compound operation so that we can test that the blocks don't exist in two LVs. Signed-off-by: S... Pull #76 06 Aug 2015 04:02PM UTC simonjbeaumont travis-ci pending completion   set done
160 master Replace LvCrop with LvTransfer operation LvCrop was only used to transfer blocks from the free list to a host. It's more useful to have an LvTransfer compound operation so that we can test that the blocks don't exist in two LVs. Signed-off-by: S... Pull #76 06 Aug 2015 01:55PM UTC simonjbeaumont travis-ci pending completion   set done
159 v0.12.0 Merge pull request #75 from jonludlam/release-0.12.0 Prepare for v0.12.0 release push 23 Jul 2015 03:45PM UTC jonludlam travis-ci pending completion   set done
158 master Merge pull request #75 from jonludlam/release-0.12.0 Prepare for v0.12.0 release push 23 Jul 2015 03:44PM UTC jonludlam travis-ci pending completion   set done
156 master Merge pull request #74 from djs55/better-debug Update to new shared-block-ring tracing API push 16 Jun 2015 01:26PM UTC djs55 travis-ci pending completion   set done
155 master Update to new shared-block-ring tracing API Signed-off-by: David Scott <dave.scott@citrix.com> Pull #74 16 Jun 2015 09:55AM UTC djs55 travis-ci pending completion   set done
153 master Allow clients to discover the PV label magic This allows clients to figure out if a volume group is using the new format or the old. Signed-off-by: David Scott <dave.scott@citrix.com> Pull #73 03 Jun 2015 11:26AM UTC djs55 travis-ci pending completion   set done
152 master Merge pull request #72 from djs55/creation_host Extend error `OnlyThisMuchFree to contain both (needed, available) push 02 Jun 2015 07:23PM UTC djs55 travis-ci pending completion   set done
151 master Extend error `OnlyThisMuchFree to contain both (needed, available) All values are in extents. Signed-off-by: David Scott <dave.scott@citrix.com> Pull #72 02 Jun 2015 06:55PM UTC djs55 travis-ci pending completion   set done
150 master Merge pull request #71 from djs55/creation_host Set the creation_host and creation_time of the redo-log push 02 Jun 2015 01:24PM UTC djs55 travis-ci pending completion   set done
  • ← Previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • Next →
  • Back to Repo
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2025 Coveralls, Inc