• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

sasrin / cf-abacus / 260 / 8
96%
master: 92%

Build:
Build:
LAST BUILD BRANCH: dev
DEFAULT BRANCH: master
Ran 16 Sep 2015 04:40AM UTC
Files 53
Run time 2s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

16 Sep 2015 04:26AM UTC coverage: 95.382%. Remained the same
NODE_VERSION="0.10"

push

travis-ci

sasrin
Add demo client, performance and integration tests to travis

Run unit, demo client, performance and integrations tests altogether as a
build step at travis. This adds a minimum of 30 seconds and a maximum of
60 seconds to build time total.

Tried various other options using travis matrix build. With matrix builds we
end up adding more builds to the queue and delaying the basic unit test
builds further by atleast 4 more minutes. Compared to 4 mins or more,
60 seconds sounded better.

Related to issue #21. Also see pivotal tracker [##102871910].

3346 of 3508 relevant lines covered (95.38%)

70.91 hits per line

Source Files on job 260.8 (NODE_VERSION="0.10")
  • Tree
  • List 0
  • Changed 4
  • Source Changed 0
  • Coverage Changed 4
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 260
  • Travis Job 260.8
  • 84de500d on github
  • Prev Job for NODE_VERSION="0.10" on perf (#257.8)
  • Next Job for NODE_VERSION="0.10" on perf (#262.8)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc