• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

onaio / rdt-standard / 2703 / 1
91%
master: 93%

Build:
Build:
LAST BUILD BRANCH: issue-628/prev-next-lbl
DEFAULT BRANCH: master
Ran 24 Nov 2020 08:04AM UTC
Files 84
Run time 10s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

24 Nov 2020 07:51AM UTC coverage: 91.084%. Remained the same
MALLOC_ARENA_MAX=2 ADB_INSTALL_TIMEOUT=10 ANDROID_TARGET=android-29 ANDROID_ABI=armeabi-v7a ANDROID_BUILD_TOOLS=28.0.3

push

travis-ci-com

zeeshan-vd
text size of pagination's prev and next buttons decreased

2084 of 2288 relevant lines covered (91.08%)

0.91 hits per line

Source Files on job 2703.1 (MALLOC_ARENA_MAX=2 ADB_INSTALL_TIMEOUT=10 ANDROID_TARGET=android-29 ANDROID_ABI=armeabi-v7a ANDROID_BUILD_TOOLS=28.0.3)
  • Tree
  • List 0
  • Changed 0
  • Source Changed 0
  • Coverage Changed 0
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 1129
  • Travis Job 2703.1
  • 57dcadd6 on github
  • Prev Job for MALLOC_ARENA_MAX=2 ADB_INSTALL_TIMEOUT=10 ANDROID_TARGET=android-29 ANDROID_ABI=armeabi-v7a ANDROID_BUILD_TOOLS=28.0.3 on issue-336 (#2691.1)
  • Next Job for MALLOC_ARENA_MAX=2 ADB_INSTALL_TIMEOUT=10 ANDROID_TARGET=android-29 ANDROID_ABI=armeabi-v7a ANDROID_BUILD_TOOLS=28.0.3 on issue-336 (#2705.1)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc