• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

awibox / react-events-timeline / 168 / 1
100%
master: 100%

Build:
Build:
LAST BUILD BRANCH: dependabot/npm_and_yarn/elliptic-6.5.4
DEFAULT BRANCH: master
Ran 07 Sep 2020 04:21PM UTC
Files 2
Run time 0s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

07 Sep 2020 04:20PM UTC coverage: 100.0%. Remained the same
168.1

Pull #112

travis-ci

web-flow
Merge 0ad532dee into 45da609d3
Pull Request #112: Bump sass-loader from 8.0.2 to 10.0.2

8 of 8 branches covered (100.0%)

11 of 11 relevant lines covered (100.0%)

4.73 hits per line

Source Files on job 168.1
  • Tree
  • List 0
  • Changed 0
  • Source Changed 0
  • Coverage Changed 0
Coverage ∆ File Lines Relevant Covered Missed Hits/Line Branch Hits Branch Misses
  • Back to Build 149
  • Travis Job 168.1
  • 7fd5b468 on github
  • Prev Job for on dependabot/npm_and_yarn/sass-loader-10.0.2 (#167.1)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc