• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

optimizely / swift-sdk / 1922 / 6
95%
master: 95%

Build:
DEFAULT BRANCH: master
Ran 02 Sep 2020 02:18AM UTC
Files 346
Run time 21s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

02 Sep 2020 02:02AM UTC coverage: 62.654% (+0.03%) from 62.624%
SCHEME=OptimizelySwiftSDK-iOS TEST_SDK=iphonesimulator PLATFORM='iOS Simulator' OS=11.1 NAME='iPad Air'

push

travis-ci-com

web-flow
fix: check to see if prefix is before build and visa versa in isBuild isPr… (#358)

* check to see if prefix is before build and visa versa in isBuild isPreRelease

* add more tests and fix split

* take out extra call to contains

15149 of 24179 relevant lines covered (62.65%)

170.03 hits per line

Source Files on job 1922.6 (SCHEME=OptimizelySwiftSDK-iOS TEST_SDK=iphonesimulator PLATFORM='iOS Simulator' OS=11.1 NAME='iPad Air')
  • Tree
  • List 0
  • Changed 38
  • Source Changed 38
  • Coverage Changed 38
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 599
  • Travis Job 1922.6
  • 3bd4e356 on github
  • Prev Job for SCHEME=OptimizelySwiftSDK-iOS TEST_SDK=iphonesimulator PLATFORM='iOS Simulator' OS=11.1 NAME='iPad Air' on master (#1901.7)
  • Next Job for SCHEME=OptimizelySwiftSDK-iOS TEST_SDK=iphonesimulator PLATFORM='iOS Simulator' OS=11.1 NAME='iPad Air' on master (#1925.7)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc