• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

USGS-Astrogeology / ale / 1350 / 1
92%
master: 92%

Build:
DEFAULT BRANCH: master
Ran 04 Jul 2020 10:08PM UTC
Files 8
Run time 0s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

01 Jul 2020 10:14PM UTC coverage: 92.386%. Remained the same
MATRIX_EVAL="CXX=g++-7 && CC=gcc-7"

api

travis-ci

web-flow
Add code to States to not interpolate if an exact solution exists (#374)

* Update format of range conversion coefficients isd output to include a separate list for times. Also update driver, test data, and remove unneeded semicolons

* Fix documentaion error

* fix other documentation error

* Add code to states to not interpolate if there is already an exact value for a time (solves divide by 0 error in interpolation code.)

* Updated to be more efficient

* lower_bound can also return the last elt. don't do that

* Added test for when no interpolation is needed for getState

910 of 985 relevant lines covered (92.39%)

17.6 hits per line

Source Files on job 1350.1 (MATRIX_EVAL="CXX=g++-7 && CC=gcc-7")
  • Tree
  • List 0
  • Changed 0
  • Source Changed 0
  • Coverage Changed 0
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 1775
  • Travis Job 1350.1
  • 4ace8786 on github
  • Prev Job for MATRIX_EVAL="CXX=g++-7 && CC=gcc-7" on master (#1349.1)
  • Next Job for MATRIX_EVAL="CXX=g++-7 && CC=gcc-7" on master (#1351.1)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc