• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

m-lab / gcp-config / 89 / 1
100%
master: 100%

Build:
DEFAULT BRANCH: master
Ran 14 Feb 2020 09:21PM UTC
Files 5
Run time 1s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

14 Feb 2020 09:19PM UTC coverage: 100.0%. Remained the same
89.1

push

travis-ci-com

web-flow
Add script with steps to normalize GCS archives (#16)

* Add script with steps to normalize GCS archives
* Add logging and early exit on error
* Perform a "safe_rsync" for every step
* Run time on gsutil operations
* Use host as the canonical name for sidestream and traceroute

332 of 332 relevant lines covered (100.0%)

1.12 hits per line

Source Files on job 89.1
  • Tree
  • List 0
  • Changed 0
  • Source Changed 0
  • Coverage Changed 0
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 85
  • Travis Job 89.1
  • 889e78c9 on github
  • Prev Job for on master (#77.1)
  • Next Job for on master (#92.1)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc