• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

OCA / vertical-isp / 196 / 2
48%
9.0: 51%

Build:
Build:
LAST BUILD BRANCH: murtuzasaleh-12.0_ADD_connector_equipment_import_cdr
DEFAULT BRANCH: 9.0
Ran 05 Dec 2019 10:42PM UTC
Files 8
Run time 1s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

05 Dec 2019 10:39PM UTC coverage: 50.711%. Remained the same
TESTS="1" ODOO_REPO="OCA/OCB"

Pull #46

travis-ci

web-flow
[IMP] Make methods less greedy
Pull Request #46: [IMP] Connector Equipment Service Method Modification

107 of 211 relevant lines covered (50.71%)

0.51 hits per line

Source Files on job 196.2 (TESTS="1" ODOO_REPO="OCA/OCB")
  • Tree
  • List 0
  • Changed 1
  • Source Changed 1
  • Coverage Changed 1
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 165
  • Travis Job 196.2
  • 87871427 on github
  • Prev Job for TESTS="1" ODOO_REPO="OCA/OCB" on 12.0-imp-conn_sp_update (#192.2)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc