• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

Codeminer42 / cm42-central / 5859 / 1
79%
master: 79%

Build:
DEFAULT BRANCH: master
Ran 21 Oct 2019 12:45PM UTC
Files 241
Run time 44s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

21 Oct 2019 12:29PM UTC coverage: 93.129%. Remained the same
2.6.0, DB=postgresql

push

travis-ci

talyssonoc
allow user switch project from another team (#587)

* allow user switch to another project from another team

* switch current team in session when change project

refact sintax to rubocop

fix switch project to v1

fix switch project to v1

switch current team in session when change project

refact with code in user model

* refact method team from project in user model and fix spec in project board operations

refact method team from project in user model and fix spec in project board operations

refact

* add test to projects controller

* fix project board operations and tests

fix validate on project board operation and add test

fix bug when switch to beta project

* fix bug when try add story in project from another session

619 of 811 branches covered (76.33%)

6275 of 6738 relevant lines covered (93.13%)

20.52 hits per line

Source Files on job 5859.1 (2.6.0, DB=postgresql)
  • Tree
  • List 0
  • Changed 2
  • Source Changed 0
  • Coverage Changed 2
Coverage ∆ File Lines Relevant Covered Missed Hits/Line Branch Hits Branch Misses
  • Back to Build 4810
  • Travis Job 5859.1
  • 3ad8b829 on github
  • Prev Job for 2.6.0, DB=postgresql on master (#5675.1)
  • Next Job for 2.6.0, DB=postgresql on master (#5860.1)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc