• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

ebu / ebu-tt-live-toolkit / 2120 / 1
85%
master: 85%

Build:
Build:
LAST BUILD BRANCH: issue-0545-fix-deploy
DEFAULT BRANCH: master
Ran 18 Oct 2019 01:19PM UTC
Files 67
Run time 4s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

18 Oct 2019 01:16PM UTC coverage: 85.104% (+0.003%) from 85.101%
2120.1

push

travis-ci

nigelmegitt
Resequencer: fix sequence number 1 if no content (#509)

While the EBUTT3Splicer is provided with the current sequence number
stored/incremented by the Resequencer, the `create_compatible_document`
method so far refers to the sequence number stored internally by
EBUTT3DocumentSequence instead. This leads to a sequence number of 1 in
the issued output document if no subtitle content is available.

To align with the correct (strictly monotonic increasing) sequence
number, always use the one stored by the Resequencer.

Fixes #502.

1070 of 1444 branches covered (74.1%)

4022 of 4726 relevant lines covered (85.1%)

0.85 hits per line

Source Files on job 2120.1
  • Tree
  • List 0
  • Changed 1
  • Source Changed 1
  • Coverage Changed 1
Coverage ∆ File Lines Relevant Covered Missed Hits/Line Branch Hits Branch Misses
  • Back to Build 2075
  • Travis Job 2120.1
  • 96acff41 on github
  • Prev Job for on release/2.1.2 (#2119.1)
  • Next Job for on release/2.1.2 (#2121.1)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc