• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

mavlink / MAVSDK / 2946 / 3
25%
main: 48%

Build:
Build:
LAST BUILD BRANCH: pr-remove-integration-tests
DEFAULT BRANCH: main
Ran 12 Feb 2019 10:45AM UTC
Files 2415
Run time 110min
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

12 Feb 2019 10:19AM UTC coverage: 24.971%. Remained the same
MATRIX_EVAL="BUILD_TARGET=coverage_build && CC=gcc-6 && CXX=g++-6"

Pull #665

travis-ci

web-flow
mission: use correct callback for download timeout

This changes the callback used in the case of a timeout while trying to
download the mission items. Before we used the wrong one, so never got
notified. This was not caught by the integration tests because they
generally only test the happy path given we had no hooks yet for a lossy
link where these things happen.
Pull Request #665: mission: use correct callback for download timeout

2190 of 8770 relevant lines covered (24.97%)

1695.0 hits per line

Source Files on job 2946.3 (MATRIX_EVAL="BUILD_TARGET=coverage_build && CC=gcc-6 && CXX=g++-6")
  • Tree
  • List 0
  • Changed 4
  • Source Changed 1
  • Coverage Changed 3
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 2377
  • Travis Job 2946.3
  • 53fca7a2 on github
  • Prev Job for MATRIX_EVAL="BUILD_TARGET=coverage_build && CC=gcc-6 && CXX=g++-6" on fix-mission-callbacks (#2943.3)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc