• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

uber / tchannel-go / 2407 / 1
88%
dev: 88%

Build:
Build:
LAST BUILD BRANCH: delayed_frame_alloc
DEFAULT BRANCH: dev
Ran 05 Oct 2018 12:06AM UTC
Files 17
Run time 1s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

04 Aug 2016 08:46PM UTC coverage: 69.482% (-17.3%) from 86.748%
TEST_TIMEOUT_SCALE=20

Pull #75

travis-ci

akshayjshah
Thread a relay.Conn interface into peer selection

Add a relay.Conn type that exposes just the prefix-matching functions added to
TChannel connections, and pass that interface into the relay routing table's Get
method.
Pull Request #75:

913 of 1314 relevant lines covered (69.48%)

0.69 hits per line

Source Files on job 2407.1 (TEST_TIMEOUT_SCALE=20)
  • Tree
  • List 0
  • Changed 0
  • Source Changed 0
  • Coverage Changed 0
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 2407
  • Travis Job 2407.1
  • 676d1db5 on github
  • Prev Job for TEST_TIMEOUT_SCALE=20 on ajs-conn-prefixes (#2405.2)
  • Next Job for TEST_TIMEOUT_SCALE=20 on ajs-conn-prefixes (#2408.2)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc