• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

NREL / OpenStudio-Beopt / 1483 / 1
30%
master: %

Build:
Build:
LAST BUILD BRANCH: moreloops
DEFAULT BRANCH: master
Ran 31 Aug 2018 12:48AM UTC
Files 1
Run time 1s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

31 Aug 2018 12:48AM UTC coverage: 30.028%. First build
1483.1

push

circleci

Scott Horowitz
Adds electric auxiliary energy for ERI. Modifies fan/pump code to calculate the needed pressure rise (or pump head) to achieve the target power consumption to avoid possible errors where the fan/pump efficiency exceeds 100%.

106 of 353 relevant lines covered (30.03%)

11200.49 hits per line

Source Files on job 1483.1
  • Tree
  • List 0
  • Changed 0
  • Source Changed 0
  • Coverage Changed 0
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 1483
  • 8472826c on github
  • Next Job for on electrix_aux_energy (#1485.2)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc