• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

ruby-concurrency / concurrent-ruby / 886 / 7
84%
master: 84%

Build:
DEFAULT BRANCH: master
Ran 04 Nov 2014 10:00AM UTC
Files 84
Run time 41s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

04 Nov 2014 09:48AM UTC coverage: 96.54%. Remained the same
rbx-2

Pull #176

travis-ci

pitr-ch
Various improvements

- untangle callback into methods for better readability
- promise tree starting with delay can be now also triggered by calling
  wait or value on any of the children
- better inspectability
- track what blocks what
- better to_s and inspect support
Pull Request #176: First draft IVar-Future-Promise-Probe unification

2818 of 2919 relevant lines covered (96.54%)

367.84 hits per line

Source Files on job 886.7 (rbx-2)
  • Tree
  • List 0
  • Changed 25
  • Source Changed 0
  • Coverage Changed 25
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 886
  • Travis Job 886.7
  • 4075f39c on github
  • Prev Job for rbx-2 on master (#881.7)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc