• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

ruby-concurrency / concurrent-ruby / 886 / 5
84%
master: 84%

Build:
DEFAULT BRANCH: master
Ran 04 Nov 2014 09:55AM UTC
Files 103
Run time 50s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

04 Nov 2014 09:48AM UTC coverage: 93.981%. Remained the same
jruby-19mode

Pull #176

travis-ci

pitr-ch
Various improvements

- untangle callback into methods for better readability
- promise tree starting with delay can be now also triggered by calling
  wait or value on any of the children
- better inspectability
- track what blocks what
- better to_s and inspect support
Pull Request #176: First draft IVar-Future-Promise-Probe unification

2998 of 3190 relevant lines covered (93.98%)

21.14 hits per line

Source Files on job 886.5 (jruby-19mode)
  • Tree
  • List 0
  • Changed 50
  • Source Changed 0
  • Coverage Changed 50
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 886
  • Travis Job 886.5
  • 4075f39c on github
  • Prev Job for jruby-19mode on master (#881.5)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2025 Coveralls, Inc