• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

itesla / ipst / 1750 / 1
13%
master: 14%

Build:
Build:
LAST BUILD BRANCH: align_to_powsybl_2_3_0
DEFAULT BRANCH: master
Ran 09 Jan 2018 11:23AM UTC
Files 810
Run time 45s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

21 Dec 2017 12:28PM UTC coverage: 13.635%. First build
1750.1

push

travis-ci

web-flow
Merge pull request #318 from itesla/nomont-patch-1

In ECH export for Eurostag:
in bus-view based export, do not create fake nodes any more, for equipments which have a "connectable bus".
Those disconnected but connectable equipments can be represented correctly in Eurostag without the help of an additional fake node.

5747 of 42148 relevant lines covered (13.64%)

0.14 hits per line

Source Files on job 1750.1
  • Tree
  • List 0
  • Changed 0
  • Source Changed 0
  • Coverage Changed 0
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 1750
  • Travis Job 1750.1
  • 01a1ef19 on github
  • Next Job for on parallel_online_workflow (#1784.1)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc