• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

openshift / openshift-ansible / 11595 / 1
51%
master: 51%

Build:
DEFAULT BRANCH: master
Ran 13 Dec 2017 08:01PM UTC
Files 64
Run time 43s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

13 Dec 2017 07:53PM UTC coverage: 54.454%. Remained the same
11595.1

push

travis-ci

web-flow
Merge pull request #6415 from mgugino-upstream-stage/crt-upgrades-pt2

Automatic merge from submit-queue.

Crt upgrades pt2

Refactor node upgrade to include less serial tasks
    
    This commit moves the pulling of images, packages,
    and updating config files into a non-serialized play.
    
    The serialized play is now in charge of marking unschedulable,
    draining, stopping and restarting services, and marking
    schedulable.
    
    If rpm install / container download takes 60s per host,
    this will save 3 hours and 10 minutes at 200 hosts per cluster
    and forks of 20 hosts.

2241 of 5663 branches covered (39.57%)

7324 of 13450 relevant lines covered (54.45%)

0.54 hits per line

Source Files on job 11595.1
  • Tree
  • List 0
  • Changed 0
  • Source Changed 0
  • Coverage Changed 0
Coverage ∆ File Lines Relevant Covered Missed Hits/Line Branch Hits Branch Misses
  • Back to Build 11595
  • Travis Job 11595.1
  • f22cd5d6 on github
  • Prev Job for on master (#11581.1)
  • Next Job for on master (#11604.1)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc