• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

ktdreyer / errata-tool / 226 / 1
38%
master: 38%

Build:
DEFAULT BRANCH: master
Ran 16 May 2017 01:41PM UTC
Files 6
Run time 0s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

16 May 2017 01:39PM UTC coverage: 37.877% (-0.4%) from 38.227%
226.1

Pull #53

travis-ci

web-flow
erratum: Fix bug sync calls

When dealing with large errata (hundreds of bugs), we were seeing
a behavior intermittently when not all bugs were being synced.
Additionally, on large errata, always syncing every bug was causing
performance issues. We identified two problems:

1) We were always syncing all bugzillas

2) The API we're hitting quietly limits bug input to 100 per
   call

This change only syncs newly-added bugs for a given erratum, but,
since it's conceivable that one might add over 100 bugs at once,
it splits the bugs to sync up into batches of 100 (max) at a time.

Signed-off-by: Lon Hohberger <lhh@redhat.com>
Pull Request #53: Sync fix

389 of 1027 relevant lines covered (37.88%)

0.38 hits per line

Source Files on job 226.1
  • Tree
  • List 0
  • Changed 2
  • Source Changed 2
  • Coverage Changed 2
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 226
  • Travis Job 226.1
  • 4ead22c6 on github
  • Prev Job for on master (#224.1)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc