• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

zeromq / libzmq / 2365 / 6
75%
master: 75%

Build:
DEFAULT BRANCH: master
Ran 24 Sep 2016 06:28PM UTC
Files 241
Run time 10s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

24 Sep 2016 06:19PM UTC coverage: 75.541% (+0.002%) from 75.539%
BUILD_TYPE=coverage CURVE=tweetnacl DRAFT=enabled

Pull #2123

travis-ci

web-flow
Problem: zmq_ctx_term segfaults with too many pending inproc connects

Solution: add a zmq_assert to check if the ephemeral sockets created
to drain the queue of pending inproc connecting sockets was allocated
successfully.
Pull Request #2123: Problem: zmq_ctx_term asserts with connect-before-bind and sockets with identity over inproc transport

8206 of 10863 relevant lines covered (75.54%)

23815.57 hits per line

Source Files on job 2365.6 (BUILD_TYPE=coverage CURVE=tweetnacl DRAFT=enabled)
  • Tree
  • List 0
  • Changed 80
  • Source Changed 1
  • Coverage Changed 80
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 2365
  • Travis Job 2365.6
  • 7210f9b6 on github
  • Prev Job for BUILD_TYPE=coverage CURVE=tweetnacl DRAFT=enabled on master (#2364.6)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc