• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

stacklok / toolhive / 25858240869 / 1
66%
main: 66%

Build:
DEFAULT BRANCH: main
Ran 14 May 2026 11:51AM UTC
Files 730
Run time 25s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

14 May 2026 11:45AM UTC coverage: 65.326% (-0.02%) from 65.341%
25858240869.1

push

github

web-flow
Split api-workloads E2E suite into parallel entries (#5275)

The api-workloads matrix entry was hitting the 15m suite timeout
because it ran 56 It blocks (17 CRUD + 39 lifecycle) sequentially,
with observed runtimes up to 14m40s — leaving almost no margin for
runner jitter.

Split into two parallel matrix entries using the existing `lifecycle`
label on api_workload_lifecycle_test.go:
- api-workloads: CRUD/validation specs (api-workloads && !lifecycle)
- api-workloads-lifecycle: lifecycle ops (api-workloads && lifecycle)

Both entries get a 25m per-entry budget via a new test_timeout matrix
field (all other entries default to 15m unchanged). Running in
parallel, the effective wall-clock time is set by the heavier
lifecycle half, not the combined total.

Closes #5265

Co-authored-by: Claude Sonnet 4.6 <noreply@anthropic.com>

64610 of 98904 relevant lines covered (65.33%)

60.51 hits per line

Source Files on job 25858240869.1
  • Tree
  • List 730
  • Changed 6
  • Source Changed 1
  • Coverage Changed 6
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 25858240869
  • 8a269b63 on github
  • Prev Job for on main (#25822434866.1)
  • Next Job for on main (#25858853642.1)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc