• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

esbtools / event-handler / 85 / 1
53%
master: 53%

Build:
DEFAULT BRANCH: master
Ran 31 Jul 2016 11:33PM UTC
Files 78
Run time 3s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

31 Jul 2016 11:20PM UTC coverage: 60.494%. Remained the same
85.1

push

travis-ci

alechenninger
Fix potential resource leak in bulk requester

I saw one case where the done callback of a future was never called. I
think what happened is somehow a null request got into the batch, and
the consequential NPE was not caught, so it propagated all the way up to
Camel, never completing the futures corresponding to that batch of
request.

So two fixes:

1. Ensure there are no null requests when queued
2. Complete futures if any exception occurs during request processing

931 of 1539 relevant lines covered (60.49%)

15.1 hits per line

Source Files on job 85.1
  • Tree
  • List 0
  • Changed 12
  • Source Changed 1
  • Coverage Changed 12
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Build 85
  • Travis Job 85.1
  • c6ed6c1d on github
  • Prev Job for on master (#84.1)
  • Next Job for on master (#86.1)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc