• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

lpgauth / metal
93%
master: 93%

Build:
Build:
LAST BUILD BRANCH: introduce-gradualizer
DEFAULT BRANCH: master
Repo Added 15 Feb 2017 11:53PM UTC
Files 1
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

LAST BUILD ON BRANCH introduce-gradualizer
branch: SELECT
CHANGE BRANCH
x
  • No branch selected
  • 0.1.0
  • 0.1.1
  • dev
  • feature/handle_msg-stop
  • master

pending completion
35

Pull #3

travis-ci

web-flow
Merge e0da1b201 into 43e28220b
Pull Request #3: Introduce gradualizer

27 of 29 relevant lines covered (93.1%)

3.0 hits per line

Relevant lines Covered
Build:
Build:
29 RELEVANT LINES 27 COVERED LINES
3.0 HITS PER LINE
Source Files on master
  • Tree
  • List 1
  • Changed 1
  • Source Changed 1
  • Coverage Changed 0
Coverage ∆ File Lines Relevant Covered Missed Hits/Line

Recent builds

Builds Branch Commit Type Ran Committer Via Coverage
35 introduce-gradualizer Merge e0da1b201 into 43e28220b Pull #3 21 Oct 2020 04:51AM UTC web-flow travis-ci pending completion  
34 feature/handle_msg-stop Add stop to handle_msg push 10 Apr 2018 03:59AM UTC lpgauth travis-ci pending completion  
33 0.1.1 Bump version 0.1.1 push 28 Apr 2017 06:16PM UTC lpgauth travis-ci pending completion  
32 master Bump version 0.1.1 push 28 Apr 2017 06:15PM UTC lpgauth travis-ci pending completion  
31 master Merge pull request #2 from shezarkhani/patch-1 Removes mod key from application file push 28 Apr 2017 06:15PM UTC web-flow travis-ci pending completion  
30 master Removes mod key from application file Since metal is a library application there is no process to start therefore there is no need for a mod key in application file Pull #2 28 Apr 2017 03:30PM UTC web-flow travis-ci pending completion  
29 master Fix DOC push 08 Mar 2017 02:51AM UTC lpgauth travis-ci pending completion  
28 0.1.0 Initial commit push 08 Mar 2017 02:40AM UTC lpgauth travis-ci pending completion  
27 master Initial commit push 08 Mar 2017 02:40AM UTC lpgauth travis-ci pending completion  
26 dev Initial commit push 08 Mar 2017 02:36AM UTC lpgauth travis-ci pending completion  
See All Builds (35)
  • Repo on GitHub
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2025 Coveralls, Inc