• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

Financial-Times / golang-ci-orb / 5072
100%
master: 0%

Build:
Build:
LAST BUILD BRANCH: (HEAD detached at v2.3.0) main
DEFAULT BRANCH: master
Ran 18 Aug 2025 12:18PM UTC
Jobs 1
Files 1
Run time 1min
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

18 Aug 2025 12:16PM UTC coverage: 100.0%. Remained the same
5072

push

circleci

web-flow
Merge pull request #49 from Financial-Times/feature/UPPSF-6118-upgrade-golangci-lint-to-v2

Upgrade golangci-lint to 2.4.0

3 of 3 relevant lines covered (100.0%)

1.0 hits per line

Jobs
ID Job ID Ran Files Coverage
1 5072.1 18 Aug 2025 12:18PM UTC 1
100.0
CircleCI Job
Source Files on build 5072
  • Tree
  • List 1
  • Changed 0
  • Source Changed 0
  • Coverage Changed 0
Coverage ∆ File Lines Relevant Covered Missed Hits/Line
  • Back to Repo
  • CircleCI Build #5072
  • c5d727e7 on github
  • Prev Build on main (#5021)
  • Next Build on main (#5071)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2025 Coveralls, Inc