• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

project-rig / nengo_spinnaker / 964
80%
master: 81%

Build:
Build:
LAST BUILD BRANCH: fix-building
DEFAULT BRANCH: master
Ran 20 Jul 2016 04:57PM UTC
Jobs 2
Files 129
Run time 45s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

pending completion
964

push

travis-ci

mundya
Re-order passthrough node removal

This new ordering removes all passthrough node to passthrough node and
passthrough node to ensemble connections before attempting to remove any
ensemble to passthrough node connections.

On my desktop PC at work this reduces the build time from >240s to <210s
for a 256-D cconv network.

6600 of 8287 relevant lines covered (79.64%)

1.15 hits per line

Jobs
ID Job ID Ran Files Coverage
1 964.1 20 Jul 2016 04:57PM UTC 0
84.65
Travis Job 964.1
2 964.2 20 Jul 2016 04:57PM UTC 0
84.65
Travis Job 964.2
Source Files on build 964
Detailed source file information is not available for this build.
  • Back to Repo
  • Travis Build #964
  • 3c6149ae on github
  • Prev Build on dev0716 (#963)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc