• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

safe-global / safe-modules / 10404150218
100%
master: 85%

Build:
Build:
LAST BUILD BRANCH: main
DEFAULT BRANCH: master
Ran 15 Aug 2024 12:59PM UTC
Jobs 1
Files 12
Run time 1min
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

15 Aug 2024 12:57PM UTC coverage: 100.0%. Remained the same
10404150218

push

github

web-flow
Fix EIP-7212 Dev Node Docker Build (#484)

The docker build for the Optimism version of Geth with 7212 support was
failing in CI. It turns out that this is related to a recent release of
Go 1.23 which is causing Ethereum Geth and forks (such as the Optimism
fork we use) to not build.

The fix it to pin to an older version of Golang (1.22 being the latest
version that works). I also, in experimenting, updated the version of
Optimism Geth we use to see if it would help - which it didn't, but
decided to leave the change in anyhow (it is just a version bump to the
source that we use to build and a small change to the patch file to
account for the changed code).

28 of 28 branches covered (100.0%)

Branch coverage included in aggregate %.

92 of 92 relevant lines covered (100.0%)

30.29 hits per line

Jobs
ID Job ID Ran Files Coverage
1 10404150218.1 15 Aug 2024 12:59PM UTC 12
100.0
GitHub Action Run
Source Files on build 10404150218
  • Tree
  • List 12
  • Changed 0
  • Source Changed 0
  • Coverage Changed 0
Coverage ∆ File Lines Relevant Covered Missed Hits/Line Branch Hits Branch Misses
  • Back to Repo
  • 829accbf on github
  • Prev Build on main (#10402167134)
  • Next Build on main (#10419780384)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2025 Coveralls, Inc