• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

emqx / mria / 740

Build:
Build:
LAST BUILD BRANCH: dev/force-load-rlog_sync-table-followup
DEFAULT BRANCH: main
Ran 19 Jun 2023 05:26PM UTC
Jobs 2
Files 27
Run time 1s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

19 Jun 2023 04:58PM UTC coverage: 56.053%. Remained the same
740

push

github

web-flow
Merge pull request #143 from emqx/fix-lb-2

Don't use a blocking call to mria_lb when connecting to the upstream shard

21 of 27 new or added lines in 4 files covered. (77.78%)

72 existing lines in 3 files now uncovered.

1051 of 1875 relevant lines covered (56.05%)

3184.2 hits per line

Jobs
ID Job ID Ran Files Coverage
1 740.1 19 Jun 2023 05:26PM UTC 0
55.89
GitHub Action Run
2 740.2 19 Jun 2023 05:26PM UTC 0
56.05
GitHub Action Run
Source Files on build 740
Detailed source file information is not available for this build.
  • Back to Repo
  • 6b18a99f on github
  • Prev Build on (#739)
  • Next Build on (#744)
  • Delete
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc