• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

ben-manes / caffeine / 1490
100%

Build:
DEFAULT BRANCH: master
Ran 02 Dec 2015 05:36AM UTC
Jobs 1
Files 63
Run time 2s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

pending completion
1490

push

travis-ci

ben-manes
Add a little tolerance due to async scheduling

When shutting down the executor, other async tasks may be rejected
that are benign to the test. For example the failed future is
removed, a no-op removal notification is published (and ignored),
and a cleanup cycle is triggered (and falls back to the calling
thread if rejected). In these cases the executor can fail without
harming the test.

4239 of 4500 relevant lines covered (94.2%)

0.94 hits per line

Jobs
ID Job ID Ran Files Coverage
1 1490.1 (TERM=dumb) 02 Dec 2015 05:36AM UTC 0
94.2
Travis Job 1490.1
Source Files on build 1490
Detailed source file information is not available for this build.
  • Back to Repo
  • Travis Build #1490
  • 1d6ee6bd on github
  • Prev Build on master (#1489)
  • Next Build on master (#1492)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc