Ran
|
Jobs
1
|
Files
49
|
Run time
7s
|
Badge
README BADGES
|
push
travis-ci
[release-v1.18] cherry-pick #1521 and #1524 (#1531) * Clone source program calls tar instead of getting piped input. This ensures we trap tar errors. Fix ready/complet check in clone controller Signed-off-by: Michael Henriksen <mhenriks@redhat.com> * Read-only clone source pods Signed-off-by: Michael Henriksen <mhenriks@redhat.com> * pick 742ca7b75 and 41e4d8238 Signed-off-by: Michael Henriksen <mhenriks@redhat.com> * add finalizer to target PVC before creating clone source pod Signed-off-by: Michael Henriksen <mhenriks@redhat.com> * Add library function to determine if a PVC has been populated fully. (#1400) * Add library function to determine if a PVC has been populated fully. The logic is as following: If PVC has no ownerRef, then we assume something else fully populated it and will return true If PVC has an ownerRef and its a DataVolume, then look up the DataVolume If DV.status.Phase == succeeded, return true, return false otherwise. Signed-off-by: Alexander Wels <awels@redhat.com> * Renamed functions to better indicate its purpose. Signed-off-by: Alexander Wels <awels@redhat.com> Signed-off-by: Michael Henriksen <mhenriks@redhat.com> Co-authored-by: Alexander Wels <awels@redhat.com>
143 of 143 new or added lines in 7 files covered. (100.0%)
6020 of 8724 relevant lines covered (69.01%)
0.77 hits per line
Lines | Coverage | ∆ | File |
---|---|---|---|
4 |
80.79 |
-0.35% | pkg/controller/datavolume-controller.go |
9 |
68.85 |
-2.15% | pkg/operator/controller/cruft.go |
25 |
76.01 |
-2.9% | pkg/controller/clone-controller.go |
58 |
3.49 |
-0.82% | cmd/cdi-cloner/clone-source.go |
Lines | Coverage | ∆ | File |
---|---|---|---|
1 |
76.01 |
-2.9% | pkg/controller/clone-controller.go |
ID | Job ID | Ran | Files | Coverage | |
---|---|---|---|---|---|
2 | 6051.2 (DOCKER_TAG=$TRAVIS_TAG GH_TOKEN=[secure]) | 49 |
69.01 |
Travis Job 6051.2 |
Coverage | ∆ | File | Lines | Relevant | Covered | Missed | Hits/Line |
---|