• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

OCA / connector-interfaces / 116
92%
9.0: 92%

Build:
Build:
LAST BUILD BRANCH: 13.0
DEFAULT BRANCH: 9.0
Ran 23 Jun 2015 10:19AM UTC
Jobs 4
Files 2
Run time 13min
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

pending completion
116

push

travis-ci

nbessi
Merge pull request #14 from guewen/add-priority-in-options

base_import_async: allow to set the base priority

2 of 2 new or added lines in 1 file covered. (100.0%)

97 of 105 relevant lines covered (92.38%)

2.77 hits per line

Jobs
ID Job ID Ran Files Coverage
1 116.1 (VERSION="8.0" LINT_CHECK="1") 23 Jun 2015 10:19AM UTC 0
Travis Job 116.1
2 116.2 (VERSION="8.0" ODOO_REPO="odoo/odoo" LINT_CHECK="0") 23 Jun 2015 10:23AM UTC 0
92.38
Travis Job 116.2
3 116.3 (VERSION="8.0" ODOO_REPO="OCA/OCB" LINT_CHECK="0") 23 Jun 2015 10:27AM UTC 0
92.38
Travis Job 116.3
4 116.4 (VERSION="8.0" UNIT_TEST="1" LINT_CHECK="0") 23 Jun 2015 10:32AM UTC 0
92.38
Travis Job 116.4
Source Files on build 116
Detailed source file information is not available for this build.
  • Back to Repo
  • Travis Build #116
  • bbef2146 on github
  • Prev Build on 8.0 (#102)
  • Next Build on 8.0 (#117)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc