• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

cgsanchez / sb.jl / 6
98%

Build:
DEFAULT BRANCH: master
Ran 23 Jan 2020 04:57PM UTC
Jobs 8
Files 7
Run time 10min
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

pending completion
6

push

travis-ci

cgsanchez
ECEID implemented

ECEID and tests implemented, ported from code written in June 2020. The energy is conserver to numerical precision basically, this is not the case for Ehrenfest where the energy conservation is of the order of the time step. There is a odd thing in the plots of the expectation value of sigma z, the path consists of straight lines joining three time steps, this is an odd feature of the integrator or I am bootstrapping it in the wrong way.

92 of 141 relevant lines covered (65.25%)

4427183.55 hits per line

Jobs
ID Job ID Ran Files Coverage
2 6.2 23 Jan 2020 04:57PM UTC 0
65.25
Travis Job 6.2
3 6.3 23 Jan 2020 04:57PM UTC 0
65.25
Travis Job 6.3
4 6.4 23 Jan 2020 04:57PM UTC 0
65.25
Travis Job 6.4
6 6.6 23 Jan 2020 05:02PM UTC 0
65.25
Travis Job 6.6
7 6.7 23 Jan 2020 05:03PM UTC 0
65.25
Travis Job 6.7
8 6.8 23 Jan 2020 05:07PM UTC 0
65.25
Travis Job 6.8
9 6.9 23 Jan 2020 04:59PM UTC 0
65.73
Travis Job 6.9
10 6.10 23 Jan 2020 05:08PM UTC 0
65.73
Travis Job 6.10
Source Files on build 6
Detailed source file information is not available for this build.
  • Back to Repo
  • Travis Build #6
  • 8e29f5a9 on github
  • Prev Build on master (#5)
  • Next Build on master (#7)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc