• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

nokia / danm / 521
24%
master: 44%

Build:
Build:
LAST BUILD BRANCH: api_group_migration
DEFAULT BRANCH: master
Ran 28 Jun 2019 01:31PM UTC
Jobs 1
Files 16
Run time 7min
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

28 Jun 2019 01:19PM UTC coverage: 23.905% (+0.1%) from 23.775%
521

push

travis-ci

Levovar
Fixing bug of not properly cleaning up after ALL interfaces when SOME of them failed during create.

The root cause is that in some cases we have returned earlier during interface creation, than starting the asynch thread.
But if some other threads have already progressed to the point of forking, they were basically prematurely reaped by the early
termination of the whole process.
Nasty.

Resolution is getting rid of ALL early return cases. In case of an early failure we simply push the result in to the syncher object, even
if the error happened in the main thread.
Only Syncher can return from the main thread, no sooner and no later than all results are available: be them pushed from the main thread, or from a fork.

551 of 2305 relevant lines covered (23.9%)

6.02 hits per line

Jobs
ID Job ID Ran Files Coverage
1 521.1 (TRAVIS_PIPELINE=docker) 28 Jun 2019 01:31PM UTC 0
23.9
Travis Job 521.1
Source Files on build 521
Detailed source file information is not available for this build.
  • Back to Repo
  • Travis Build #521
  • 47290e3a on github
  • Prev Build on fix_add_gc (#519)
  • Next Build on fix_add_gc (#523)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc