• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

nokia / danm / 520
24%
master: 44%

Build:
Build:
LAST BUILD BRANCH: api_group_migration
DEFAULT BRANCH: master
Ran 27 Jun 2019 04:47PM UTC
Jobs 1
Files 16
Run time 41s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

27 Jun 2019 04:36PM UTC coverage: 23.775% (-0.3%) from 24.04%
520

Pull #102

travis-ci

web-flow
Fixing bug of not properly cleaning up after ALL interfaces when SOME of them failed during create.

The root cause is that in some cases we have returned earlier during interface creation, than starting the asynch thread.
But if some other threads have already progressed to the point of forking, they were basically prematurely reaped by the early
termination of the whole process.
Nasty.

Resolution is getting rid of ALL early return cases. In case of an early failure we simply push the result in to the syncher object, even
if the error happened in the main thread.
Only Syncher can return from the main thread, no sooner and no later than all results are available: be them pushed from the main thread, or from a fork.
Pull Request #102: [WIP]Some interfaces are not properly cleaned during CNI_ADD if some other interface creations fail

52 of 52 new or added lines in 4 files covered. (100.0%)

553 of 2326 relevant lines covered (23.77%)

6.57 hits per line

Jobs
ID Job ID Ran Files Coverage
1 520.1 (TRAVIS_PIPELINE=docker) 27 Jun 2019 04:47PM UTC 0
23.77
Travis Job 520.1
Source Files on build 520
Detailed source file information is not available for this build.
  • Back to Repo
  • Travis Build #520
  • Pull Request #102
  • PR Base - master (#518)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc