• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

ICRAR / ijson / 22
100%

Build:
DEFAULT BRANCH: master
Ran 27 Jun 2019 03:38AM UTC
Jobs 7
Files 10
Run time 21min
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

pending completion
22

push

travis-ci

rtobar
Handling yajl<1.0.12 on cffi loading

This is a further fix for the problem described in isagalaev/ijson#66.
A previous commit (144bf7d) had solved this for ctypes-based library
loading, but cffi-based library loading was still failing, at least in
python 3.

Signed-off-by: Rodrigo Tobar <rtobar@icrar.org>

447 of 491 relevant lines covered (91.04%)

5.25 hits per line

Jobs
ID Job ID Ran Files Coverage
1 22.1 (YAJL_VERSION=1.0.12) 27 Jun 2019 03:38AM UTC 0
62.53
Travis Job 22.1
2 22.2 27 Jun 2019 03:38AM UTC 0
79.84
Travis Job 22.2
3 22.3 (YAJL_VERSION=1.0.9) 27 Jun 2019 03:38AM UTC 0
63.14
Travis Job 22.3
4 22.4 27 Jun 2019 03:38AM UTC 0
79.84
Travis Job 22.4
5 22.5 27 Jun 2019 03:38AM UTC 0
79.84
Travis Job 22.5
6 22.6 27 Jun 2019 03:38AM UTC 0
79.84
Travis Job 22.6
7 22.7 27 Jun 2019 03:39AM UTC 0
79.84
Travis Job 22.7
Source Files on build 22
Detailed source file information is not available for this build.
  • Back to Repo
  • Travis Build #22
  • 11e42aac on github
  • Prev Build on master (#20)
  • Next Build on master (#25)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc