• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

Spirals-Team / repairnator / 1942
55%

Build:
DEFAULT BRANCH: master
Ran 31 Jul 2018 12:32PM UTC
Jobs 1
Files 134
Run time 19s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

pending completion
1942

push

travis-ci

surli
Improve mail notification for end of process (#678)

fix #546 
Attempt at resolving issue #546. 

If I have understood the end of process notification correctly, then the start and end of the repair attempt was already mentioned in the mail. The only thing lacking was the duration, or if duration is not the same as uptime I have made a mistake. Should I perhaps `config.getInstance().getDuration().toString()` instead?

2889 of 5271 relevant lines covered (54.81%)

0.55 hits per line

Jobs
ID Job ID Ran Files Coverage
1 1942.1 31 Jul 2018 12:32PM UTC 0
54.81
Travis Job 1942.1
Source Files on build 1942
Detailed source file information is not available for this build.
  • Back to Repo
  • Travis Build #1942
  • be9baaa9 on github
  • Prev Build on master (#1940)
  • Next Build on master (#1947)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc