• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

Brightspace / ifrau / 325
97%
master: 94%

Build:
Build:
LAST BUILD BRANCH: depowell/sync-flags
DEFAULT BRANCH: master
Ran 19 Dec 2017 10:45PM UTC
Jobs 1
Files 24
Run time 1s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

pending completion
325

push

travis-ci

dlockhart
syncing the "data-intl-overrides" attribute on the <html> element between the host and client

171 of 192 branches covered (89.06%)

478 of 493 relevant lines covered (96.96%)

12.3 hits per line

Jobs
ID Job ID Ran Files Coverage
1 325.1 19 Dec 2017 10:45PM UTC 0
96.96
Travis Job 325.1
Source Files on build 325
  • List 0
  • Changed 1
  • Source Changed 0
  • Coverage Changed 1
Coverage ∆ File Lines Relevant Covered Missed Hits/Line Branch Hits Branch Misses
  • Back to Repo
  • Travis Build #325
  • 601fc069 on github
  • Prev Build on sync-intl-overrides (#323)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2025 Coveralls, Inc