• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

itesla / ipst / 1674
12%
master: 14%

Build:
Build:
LAST BUILD BRANCH: align_to_powsybl_2_3_0
DEFAULT BRANCH: master
Ran 01 Dec 2017 04:43PM UTC
Jobs 1
Files 787
Run time 15min
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

pending completion
1674

push

travis-ci

CBiasuzzi
logs generators not included (because they are connected to low level voltage)

1 of 1 new or added line in 1 file covered. (100.0%)

5050 of 41106 relevant lines covered (12.29%)

0.12 hits per line

New Missed Lines in Diff

Lines Coverage ∆ File
1
100.0
eurostag-step-up-transformer/src/main/java/eu/itesla_project/iidm/ddb/eurostag/EurostagStepUpTransformerInserter.java

Uncovered Existing Lines

Lines Coverage ∆ File
1
100.0
eurostag-step-up-transformer/src/main/java/eu/itesla_project/iidm/ddb/eurostag/EurostagStepUpTransformerInserter.java
Jobs
ID Job ID Ran Files Coverage
1 1674.1 01 Dec 2017 04:43PM UTC 0
12.29
Travis Job 1674.1
Source Files on build 1674
Detailed source file information is not available for this build.
  • Back to Repo
  • Travis Build #1674
  • f148f0be on github
  • Prev Build on step_up_transf_improve_error_msgs (#1671)
  • Next Build on step_up_transf_improve_error_msgs (#1682)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc