• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

ruby-concurrency / concurrent-ruby / 841
84%

Build:
DEFAULT BRANCH: master
Ran 01 Sep 2014 10:03AM UTC
Jobs 6
Files 103
Run time 7min
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

pending completion
841

push

travis-ci

pitr-ch
Merge pull request #160 from ruby-concurrency/actress

Do not fail when there is an error in logger callback

3 of 3 new or added lines in 1 file covered. (100.0%)

3124 of 3295 relevant lines covered (94.81%)

1863.2 hits per line

New Missed Lines in Diff

Lines Coverage ∆ File
3
100.0
lib/concurrent/logging.rb

Uncovered Existing Lines

Lines Coverage ∆ File
1
100.0
lib/concurrent/logging.rb
Jobs
ID Job ID Ran Files Coverage
1 841.1 (2.1.2) 01 Sep 2014 10:03AM UTC 0
90.59
Travis Job 841.1
2 841.2 (2.0.0) 01 Sep 2014 10:05AM UTC 0
90.59
Travis Job 841.2
3 841.3 (1.9.3) 01 Sep 2014 10:03AM UTC 0
90.59
Travis Job 841.3
4 841.4 (ruby-head) 01 Sep 2014 10:04AM UTC 0
90.59
Travis Job 841.4
5 841.5 (jruby-19mode) 01 Sep 2014 10:05AM UTC 0
93.77
Travis Job 841.5
7 841.7 (rbx-2) 01 Sep 2014 10:10AM UTC 0
96.52
Travis Job 841.7
Source Files on build 841
Detailed source file information is not available for this build.
  • Back to Repo
  • Travis Build #841
  • 7cd201e1 on github
  • Prev Build on master (#838)
  • Next Build on master (#850)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc