• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

sirosen / SALVE / 115
85%
stable: 100%

Build:
Build:
LAST BUILD BRANCH: wip/refactor/2-3-0-cleanup
DEFAULT BRANCH: stable
Ran 24 Aug 2014 06:12AM UTC
Jobs 4
Files 34
Run time 28s
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

pending completion
115

push

travis-ci

sirosen
Split E2E tests into 'Integration' and 'System'

Separating out the tests helps to flatten the directory structure a bit and
remove some of the cruft. Also replaces ill-defined custom name for a part of
the testsuite with the standard automated testing names.

1251 of 1251 relevant lines covered (100.0%)

4.0 hits per line

Jobs
ID Job ID Ran Files Coverage
1 115.1 24 Aug 2014 06:13AM UTC 0
100.0
Travis Job 115.1
3 115.3 24 Aug 2014 06:12AM UTC 0
99.84
Travis Job 115.3
4 115.4 24 Aug 2014 06:13AM UTC 0
99.84
Travis Job 115.4
5 115.5 24 Aug 2014 06:13AM UTC 0
99.84
Travis Job 115.5
Source Files on build 115
Detailed source file information is not available for this build.
  • Back to Repo
  • Travis Build #115
  • 6bf8bf41 on github
  • Prev Build on wip/refactor/2-3-0-cleanup (#114)
  • Next Build on wip/refactor/2-3-0-cleanup (#116)
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2026 Coveralls, Inc