• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

mp911de / logstash-gelf / 178

Builds Branch Commit Type Ran Committer Via Coverage
178 master Create new SocketChannel when the socket is closed #83 Don't reuse closed channels as they cannot recover once they are closed. Closing happens on connection errors. push 20 May 2016 09:55AM UTC mp911de travis-ci pending completion   set done
177 master Rethrow Exceptions in log4j2 GelfLogAppender #78 The GelfLogAppender for log4j2 is now able to throw exceptions when setting ignoreExceptions to false in the appender configuration. Exception propagation is useful for connection errors and except... push 20 May 2016 09:33AM UTC mp911de travis-ci pending completion   set done
176 master Exclude JUnit from json-simple #81 push 19 May 2016 01:19PM UTC mp911de travis-ci pending completion   set done
175 master Change facility field to optional field #79 Facility is optional now and can be set to an empty value. It defaults to "logstash-gelf" if not configured at all. push 21 Apr 2016 12:53PM UTC mp911de travis-ci pending completion   set done
174 master Update link to CONTRIBUTING.md push 19 Apr 2016 12:19PM UTC mp911de travis-ci pending completion   set done
173 master [maven-release-plugin] prepare for next development iteration push 15 Apr 2016 08:29AM UTC mp911de travis-ci pending completion   set done
172 logstash-gelf-1.9.0 [maven-release-plugin] prepare release logstash-gelf-1.9.0 push 15 Apr 2016 08:29AM UTC mp911de travis-ci pending completion   set done
171 master [maven-release-plugin] prepare release logstash-gelf-1.9.0 push 15 Apr 2016 08:28AM UTC mp911de travis-ci pending completion   set done
170 master Adopt coveralls changes. push 15 Apr 2016 08:27AM UTC mp911de travis-ci pending completion   set done
169 master Adopt coveralls changes push 15 Apr 2016 08:16AM UTC mp911de travis-ci pending completion   set done
167 master Perform hostname resolution on each TCP connect #77 The TCP sender does not longer cache the hostname resolution result but performs a host lookup on each connection attempt. The very first hostname resolution is still in place to fail early if t... push 14 Apr 2016 07:00AM UTC mp911de travis-ci pending completion   set done
166 master Improve contribution assets #76 push 04 Apr 2016 03:16PM UTC mp911de travis-ci pending completion   set done
165 master Bump netty to 4.0.35.Final push 03 Apr 2016 03:03PM UTC mp911de travis-ci pending completion   set done
164 master Fallback to exception string if log message is empty #75 In case an exception is logged without any additional message the log event was considered invalid and dropped. The message assembler will use Throwable.toString in such case to produce a v... push 30 Mar 2016 06:15AM UTC mp911de travis-ci pending completion   set done
163 issue/75 Fallback to exception string if log message is empty #75 In case an exception is logged without any additional message the log event was considered invalid and dropped. The message assembler will use Throwable.toString in such case to produce a v... push 29 Mar 2016 09:06AM UTC mp911de travis-ci pending completion   set done
  • ← Previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • Next →
  • Back to Repo
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2025 Coveralls, Inc