• Home
  • Features
  • Pricing
  • Docs
  • Announcements
  • Sign In

mezuro / prezento
99%
master: 99%

Build:
Build:
LAST BUILD BRANCH: locale_review
DEFAULT BRANCH: master
Repo Added 07 Nov 2013 03:28PM UTC
Files 168
Badge
Embed ▾
README BADGES
x

If you need to use a raster PNG badge, change the '.svg' to '.png' in the link

Markdown

Textile

RDoc

HTML

Rst

LAST BUILD ON BRANCH calendar
branch: calendar
CHANGE BRANCH
x
Reset
  • calendar
  • I53-controller_inheritance
  • assynchronous_show
  • broken_compound_update
  • brokenlink
  • btnsizefix
  • cache
  • client_replace
  • cloning-2
  • colorpicker
  • colorpicker_test
  • configuration
  • configuration_clone
  • configuration_clone_metric_conf
  • configuration_stats
  • dev
  • docker_dev_env
  • dojo2
  • edit_account
  • edit_range
  • fix_travis
  • graphic
  • graphic-style
  • helpcontainer
  • issue_03
  • kalibro_gem
  • locale_review
  • master
  • metric_configuration
  • numeric_validation
  • partial_travis_fix
  • project_customization
  • rails4.1
  • range
  • reading
  • reading_group
  • ref_config_workflow
  • refactoring_config
  • repository_new_fields
  • repository_reload
  • repository_reprocess
  • rspec3
  • tooltip
  • usability_signin
  • usability_signin_rebased
  • user_projects
  • v0.0.1.alpha1
  • vinicius_config

pending completion
290

push

travis-ci

Diegoamc
Calendar.

Missing acceptance tests.

Signed-off-by: Rafael Manzo <rr.manzo@gmail.com>
Signed-off-by: Renan Fichberg <rfichberg@gmail.com>

252 of 254 relevant lines covered (99.21%)

2.48 hits per line

Relevant lines Covered
Build:
Build:
254 RELEVANT LINES 252 COVERED LINES
2.48 HITS PER LINE
Source Files on calendar
  • List 0
  • Changed 1
  • Source Changed 1
  • Coverage Changed 1
Coverage ∆ File Lines Relevant Covered Missed Hits/Line

Recent builds

Builds Branch Commit Type Ran Committer Via Coverage
290 calendar Calendar. Missing acceptance tests. Signed-off-by: Rafael Manzo <rr.manzo@gmail.com> Signed-off-by: Renan Fichberg <rfichberg@gmail.com> push 11 Dec 2013 07:25PM UTC Diegoamc travis-ci pending completion  
286 calendar Calendar. Created dropdown boxes to insert a date to get the processing from. Signed-off-by: Renan Fichberg <rfichberg@gmail.com> push 11 Dec 2013 03:47PM UTC Diegoamc travis-ci pending completion  
285 calendar Calendar. Created dropdown boxes to insert a date to get the processing from. Signed-off-by: Renan Fichberg <rfichberg@gmail.com> push 10 Dec 2013 08:27PM UTC Diegoamc travis-ci pending completion  
283 calendar Calendar. Created dropdown boxes to insert a date to get the processing from. Signed-off-by: Renan Fichberg <rfichberg@gmail.com> push 10 Dec 2013 07:30PM UTC Diegoamc travis-ci pending completion  
See All Builds (505)
  • Repo on GitHub
STATUS · Troubleshooting · Open an Issue · Sales · Support · CAREERS · ENTERPRISE · START FREE · SCHEDULE DEMO
ANNOUNCEMENTS · TWITTER · TOS & SLA · Supported CI Services · What's a CI service? · Automated Testing

© 2025 Coveralls, Inc